Main_banner02
Banner 8
CHEMICAL INFORMATION MANAGEMENT SYSTEM (CIMS)
CHEMICAL INFORMATION MANAGEMENT SYSTEM (CIMS)
Web_Banner_OSH_Award_2024
Web_Banner_OSH_Award_2024
banner jkkp12 BKTB
banner jkkp12 BKTB
GUIDELINES_ON_OCCUPATIONAL_SAFETY_AND_HEALTH
GUIDELINES_ON_OCCUPATIONAL_SAFETY_AND_HEALTH
Maklumat Terkini Tindakan Pendakwaan dan Kompaun - copy
Maklumat Terkini Tindakan Pendakwaan dan Kompaun - copy
PANDUAN PERMOHONAN PEMERIKSAAN BERKALA LOJI
PANDUAN PERMOHONAN PEMERIKSAAN BERKALA LOJI
Silibus Baharu Kursus Penyelia Keselamatan Tapak
Silibus Baharu Kursus Penyelia Keselamatan Tapak
MAKLUMAT_BAHARU_BERKENAAN_PEMASANG_PEMERIKSAN__PENYELIA_PERANCAH_TIUB_8.jpg
MAKLUMAT_BAHARU_BERKENAAN_PEMASANG_PEMERIKSAN__PENYELIA_PERANCAH_TIUB_8.jpg
Banner Kaedah Bayaran Kaunter
Banner Kaedah Bayaran Kaunter
OSHMP 2021 - 2025
PELAN INDUK KESELAMATAN DAN KESIHATAN PEKERJAAN 2021 -2025 (OSHMP25)
"KKP Inklusif-Kebersamaan dan Komitmen"
Image is not available
OSHMP 2021 - 2025
MAKLUMAT_BAHARU_BERKENAAN_PEMASANG_PEMERIKSAN__PENYELIA_PERANCAH_TIUB_5.jpg
MAKLUMAT_BAHARU_BERKENAAN_PEMASANG_PEMERIKSAN__PENYELIA_PERANCAH_TIUB_5.jpg
previous arrow
next arrow
banner6
Pemakluman_CEP_8_dan_15-1.png
images/WEBSITE.png
MAKLUMAN BEJANA TEKANAN BERAPI THERMAL OIL HEATER
PEMAKLUMAN NAMA AKKP 1994 (AKTA 514)
UJIAN TEKANAN
EPD
Notis Pembagasan Pasir
Permohonan bagi peperiksaan Jurutera Stim / Enjin Pembakaran Dalam - copy
previous arrow
next arrow

Mosque ceiling collapses

New Straits Times Online, 30 September 2013

news nst30092013
The damaged interior of the Kampung Tebauk mosque in Kampung Bukit Tunggal, Kuala Terengganu, which was bulit at a cost of RM2.5 million and was completed in 2011. Pic by Imran Makhzan

RM5.6M BUILDING: No one was injured in the 4am incident in Kuala Terengganu kampung

KUALA TERENGGANU: IN yet another case of a roof or ceiling collapsing in the state, residents of Kampung Tebauk who went for morning prayers yesterday were shocked to discover that the ceiling of the open prayer hall had caved in.

However, no one was injured in the incident, which was believed to have occurred at 4am.

According to mosque committee member Mohd Jamal Ngah, 50, the mosque's muezzin, Man Mat, in his 60s, was the first to discover the collapse.

State secretary Datuk Mazlan Ngah, who visited the mosque at noon, said he was saddened by the incident as it was the second incident involving a mosque this year, after the foyer roof of the Kampung Binjai Kertas mosque in Hulu Terengganu collapsed in May.

He said the state Public Works Department (PWD) had informed him that it would look into the design and construction of the supporting structure together with the Department of Occupational Safety and Health.

"The RM5.6 million mosque was completed in 2011, and the villagers have been using it since Hari Raya Aidiladha that year."

Mazlan said the PWD would isolate the electrical wiring of the open prayer hall to avoid any untoward incidents.

State Science, Technology, Environment, Green Technology and Water Committee chairman Datuk Ahmad Razif Abdul Rahman said further investigations must be carried out before deciding whether the prayer hall was safe to be used.

"The fact that the prayer hall is connected to the damaged portion is a cause for concern.

"PWD needs to ensure it is safe for use."

He said construction of the mosque began in January 2010 and was completed on Oct 24 the following year.

"There are a few suspected causes (of the collapse). One of them is the design.

"Another is the materials used for the installation.

"Most probably, as in previous cases, the collapse could have been caused by materials or installation that were not according to the plans or specifications."

He said the estimated cost of repairing the ceiling was between RM200,000 and RM250,000.

State PWD director Datuk Shafii Mohammad said it would blacklist the materials supplier as they had given the assurance that the structure would last for at least 10 years.

"They will also have to give an explanation as to why (the structure) collapsed."

Shafii added that the ceiling and roof were still under warranty and the suppliers and main contractor will have to replace it.

"The warranty for the roof and ceiling works is for 10 years.

"Since the construction of mosque was completed only two years ago, there are still eight years left on the warranty."

 

Print Email

Slide 1

OSH Information Centre

safety alert   statistics    prosecution    fatal acc case

prosecution    HIGIEN    pet safety    construction en

kimia en    SME    SME    SME

.

Video KKP

Highlights Of Events

AKP
Libat Urus
Ceramah KKP
Libat Urus
NATIONAL OCCUPATIONAL SAFETY AND HEALTH AWARD 2023
PERSIDANGAN KEMUNCAK BAGI KESELAMATAN DAN KESIHATAN PEKERJAAN BERSAMA SYARIKAT-SYARIKAT BERKAITAN KERAJAAN (GLC OSH SUMMIT)
Occupational Health Carnival KESUMA MADANI 2024
RATIFIKASI KONVENSYEN KESELAMATAN DAN KESIHATAN PEKERJAAN, 1981 (NO. 155)
Operation SPARK
MAJLIS PENUTUP MINGGU KESELAMATAN DAN KESIHATAN PEKERJAAN (OSH WEEK) PERINGKAT KEBANGSAAN 2024
KONVENSYEN STEPWISE OSH LEVEL VERIFICATION AND ENHANCEMENT FOR SMALL AND MEDIUM ENTERPRISE (SOLVE 4 SME) PERINGKAT KEBANGSAAN 2024
NATIONAL OSH INNOVATION AND TECHNOLOGY IN IR 4.0 EXPO
OCCUPATIONAL SAFETY AND HEALTH EDUCATION AND RESEARCH CONVENTION 2024
Seminar Hebahan Akta Keselamatan dan Kesihatan Pekerjaan (Pindaan) 2022 dan Akta Kilang dan Jentera (Pemansuhan) 2022 Peringkat Zon Tengah
Konvensyen Systematic Occupational Health Enhancement Level Programme (SOHELP) Kebangsaan Kali Ke-7 bagi tahun 2024
Sambutan Hari Sedunia bagi Keselamatan dan Kesihatan di Tempat Kerja 2024
ASEAN OSHNET DI QUEZON CITY, THE PHILIPPINES
KEJARI 4.0 DI BANGI AVENUE CONVENTION CENTRE
LAWATAN KE TAPAK MERDEKA 118
PROGRAM GOTONG ROYONG KUDAH (KUTIP SAMPAH SAMBIL RIADAH)
previous arrow
next arrow